Project is located at Mermenli creek which is in Devrekanı District of Kastamonu city in West Blacksea Region.

Scope of Project: Aybige Intake was designed at 936.00 m talveg elevation and 940.00 m crest elevation of Mermenli Creek. Creek discharge is trasferred to the head pond which is integrated to the left side of weir. Penstock length is 989.055 m. Penstock was installed in tunnel at km:0+259.616 to km:0+700.00. Aybige HEPP tailwater level is 730.0 m.


  • Investor
  • YEK Energy
  • Location
  • Devrekanı / Kastamonu
  • Installed Power
  • 6.5 MW
  • Design Discharge
  • 3.5 m³/s
  • Net Head
  • 200 m
  • Contract Year
  • 2015
  • Services
  • FR
  • FD
  • DeD
  • Progress
  • Operation