Project is a part of Yamanlı-2 HEPP is located in Saimbeyli district of Adana city.
Assessment report of pumping alternative of Hocabey creek to the main energy tunnel is prepared by Beray. Diversion weir with coanda screen (discharge is 2.5 m3/s) was designed and pumps were chosen and the pumping pipeline design was completed.
Project is an interesting example of an extreme engineering.
2025 © Beray Mühendislik. All rights reserved.